Adapted mixed-prec multi-shift test to new way to pass gauge BC directions and added cmdline option to perform the G-parity plaquette comparison with the corrected plaquette when loading config
A reliable update step is performed at a tunable frequency to correct the residual. A final mixed-prec single-shift solve is performed on each pole to perform cleanup if necessary.
A test is provided to demonstrate the algorithm.