Peter Boyle
d1afebf71e
Sizable improvement in multigrid for unsquared.
...
6000 matmuls CG unprec
2000 matmuls CG prec (4000 eo muls)
1050 matmuls PGCR on 16^3 x 32 x 8 m=.01
Substantial effort on timing and logging infrastructure
2015-07-24 01:31:13 +09:00
Peter Boyle
0007669381
Printing change
2015-07-21 13:51:56 +09:00
Peter Boyle
8eaf657f95
VPGCR updates
2015-06-30 15:02:27 +01:00
Peter Boyle
a17684ebe2
Some small steps towards a multigrid
2015-06-22 12:49:44 +01:00
Azusa Yamaguchi
3b4118f33e
Variable preconditioned GCR with restarting.
...
Orthogonalisation depth and restart frequency is controllable via constructor
2015-06-21 10:58:46 +01:00
Peter Boyle
960f29c0b1
Will start this as a two level algorithm
2015-06-20 22:24:21 +01:00