So valence sector looks ok.
FermionOperatorImpl.h provides the policy classes.
Expect HMC will introduce a smearing policy and a fermion representation change policy template
param. Will also probably need multi-precision work.
* HMC is running even-odd and non-checkerboarded (checked 4^4 wilson fermion/wilson gauge).
There appears to be a bug in the multi-level integrator -- <e-dH> passes with single level but
not with multi-level.
In any case there looks to be quite a bit to clean up.
This is the "const det" style implementation that is not appropriate yet for clover since
it assumes that Mee is indept of the gauge fields. Easily fixed in future.
Allows multi-precision work and paves the way for alternate BC's and such like
allowing for example G-parity which is important for K pipi programme.
In particular, can drive an extra flavour index into the fermion fields
using template types.
Allows multi-precision work and paves the way for alternate BC's and such like
allowing for example G-parity which is important for K pipi programme.
In particular, can drive an extra flavour index into the fermion fields
using template types.
Example of multiple levels in the WilsonFermion hmc test.
Merge remote-tracking branch 'upstream/master'
Conflicts:
lib/qcd/hmc/HMC.h
lib/qcd/hmc/integrators/Integrator.h
lib/qcd/hmc/integrators/Integrator_algorithm.h
tests/Test_simd.cc
Example of multiple levels in the WilsonFermion hmc test.
Merge remote-tracking branch 'upstream/master'
Conflicts:
lib/qcd/hmc/HMC.h
lib/qcd/hmc/integrators/Integrator.h
lib/qcd/hmc/integrators/Integrator_algorithm.h
tests/Test_simd.cc
exp(-DeltaH) = 1 now, and plaquette is sensible. Will reproduce an old Wilson Gauge
Wilson Fermion SCRI plaquette with precision in mass matching shortly.
exp(-DeltaH) = 1 now, and plaquette is sensible. Will reproduce an old Wilson Gauge
Wilson Fermion SCRI plaquette with precision in mass matching shortly.
6000 matmuls CG unprec
2000 matmuls CG prec (4000 eo muls)
1050 matmuls PGCR on 16^3 x 32 x 8 m=.01
Substantial effort on timing and logging infrastructure
6000 matmuls CG unprec
2000 matmuls CG prec (4000 eo muls)
1050 matmuls PGCR on 16^3 x 32 x 8 m=.01
Substantial effort on timing and logging infrastructure